Virginia Military Institute Buildings & Grounds Facility

switchflip Industrial

This large pre-engineered maintenance facility includes exterior fueling stations and storage area on this high traffic site that includes an extensive storm water management system. Owner: Virginia Military Institute Architect:  Hayes, Seay, Mattern & Mattern Location:  Lexington, VA

New River Electrical

switchflip Industrial

This addition was a negotiated project and our second of three projects with New River Electrical. Owner: New River Electrical Architect: Hughes Associates Architects & Engineers Location: Cloverdale, VA

Virginia Tech Materials Management

switchflip Industrial

This 7,500 square foot waste management facility has blast proof curtain walls and curved structural steel as well as a 5,00 gallon underground tank. The facility’s purpose is to properly store, consolidate, package and ship hazardous waste materials from campus. Owner: Virginia Polytechnic Institute & State University Architect: Wiley/Wilson Location: Blacksburg, VA

James River Equipment

switchflip Industrial

G & H Contracting provided team build services to construct a 16,000 square foot sales and service facility.  This industrial service facility contains an overhead bridge crane. Owner: James River Equipment Architect: Balzer & Associates Location: Salem, VA

Reliable Tractor

switchflip Industrial

This pre-engineered facility is an industrial/heavy equipment maintenance facility for Stafford Equipment.  The project features industrial concrete floor construction with steel dust hardeners applied. Owner: Stafford Equipment Architect:  CNNA, Atlanta, GA Location: Cloverdale, VA